Illustrative image – not actual.
Punjab Chief Minister, Sukhbir Singh Badal laid foundation stone for the 150 MW solar energy plant at Muktsar’s Vanwala village on 3 June, 2016.
The solar-based power project is of Azure Power India. The estimated cost of the project is Rs 800 crore.
