Foundation stone laid for solar power Vanwala projectIllustrative image – not actual.

Punjab Chief Minister, Sukhbir Singh Badal laid foundation stone for the 150 MW solar energy plant at Muktsar’s Vanwala village on 3 June, 2016.

The solar-based power project is of Azure Power India. The estimated cost of the project is Rs 800 crore.

← All latest storiesBack to top →