Illustrative image – not actual.Sheila Dikshit, Chief Minister of Delhi, laid the foundation stone for the signal-free corridor project from Mukarba Chowk to Wazirabad Chowk along the Outer Ring Road, on 21 July 2013.
The 8 km signal-free corridor project is being set up with an investment of Rs 633 crore. It comprises four flyovers including an 8-lane at Bhalaswa, 7-lane at Mukundpur Chowk, 6-lane at Burari, and 4-lane at Jagatpur. All four will have two carriageways that will be constructed on single pillars. At ground level too, capacity of the road for different modes of transport is being augmented. Three-lane carriageways are being provided on both sides, besides service roads for local traffic, 2.5 mtr wide footpaths and 2 mtr wide cycle paths.
This project is part of the Outer Ring Road project from Vikaspuri to Wazirabad, which will be connected with the Signature Bridge and will help provide a quick connection to Noida. This project will cost around Rs 2,200 crore.
Related Link:
Project profile
