Illustrative image – not actual.Dinesh Trivedi, Union Minister for Railways, and A K Antony, Union Minister for Defence, on 9 November 2011, laid foundation stone for Rishikesh-Karanprayag rail project in Chamoli district of Uttarakhand.
The 125.09 km long rail link is estimated to cost Rs 4,295.3 crore. The rail link will pass through Dehradun, Tehri Garhwal, Pauri Garhwal and Chamoli districts. It will allow pilgrims comfortable access to the Kedarnath and Badrinath shrines, Devprayag, Rudraprayag and Karnprayag.
Rail Vikas Nigam (RVNL) will be executing the project. Altogether, there will be 128 bridges - 45 major and 83 minor ones. A viaduct of 535 meters between Sakni and Devprayag will be the longest bridge. There will be 19 tunnels, with more than one-km length and the longest one is 4.475 km between Sakni and Devprayag. About 58.64 km will be covered through 81 tunnels. There will be 12 stations including Rishikesh, Karnprayag, Srinagar, Rudraprayag and Devprayag.
ALso See:
RVNL invites bids for doubling of track in Tamil Nadu (28-June-11)
Related Links:
Project profile
The 125.09 km long rail link is estimated to cost Rs 4,295.3 crore. The rail link will pass through Dehradun, Tehri Garhwal, Pauri Garhwal and Chamoli districts. It will allow pilgrims comfortable access to the Kedarnath and Badrinath shrines, Devprayag, Rudraprayag and Karnprayag.
Rail Vikas Nigam (RVNL) will be executing the project. Altogether, there will be 128 bridges - 45 major and 83 minor ones. A viaduct of 535 meters between Sakni and Devprayag will be the longest bridge. There will be 19 tunnels, with more than one-km length and the longest one is 4.475 km between Sakni and Devprayag. About 58.64 km will be covered through 81 tunnels. There will be 12 stations including Rishikesh, Karnprayag, Srinagar, Rudraprayag and Devprayag.
ALso See:
RVNL invites bids for doubling of track in Tamil Nadu (28-June-11)
Related Links:
Project profile
