Illustrative image – not actual.Chief Minister of Tamil Nadu Edappadi K Palaniswami laid the foundation stone for a flyover at Kalavasal junction in Madurai, Tamil Nadu.
The four-lane flyover will be developed at the cost of Rs 54.07 crore. Once completed the flyover will ease vehicular congestion at the junction where Madurai-Theni road and Madurai-Dindigul bypass road cut across.
The flyover will be constructed on Madurai-Dindigul Bypass Road in 15 months.
In addition, the state government has ordered a re-survey for the bridge proposed to decongest traffic at Goripalayam junction.
The flyover will be built on Thondi Road-Sivaganga Road junction. The cost of the project is Rs 56 crore. The northern bank road along Vaigai river connecting Kuruvikkaran Salai Bridge and PTR Bridge in Anna Nagar will be constructed at a cost of Rs 16.3 crore.
Apart from this, the government has announced construction of sewage treatment plants (STPs) in the city to prevent sewage water into Vaigai river.
A road along the Vaigai as a service road parallel to the road over bridge at Sellur to connect Kulamangalam Road will be constructed. The project will be developed at a cost of Rs three crore.
The four-lane flyover will be developed at the cost of Rs 54.07 crore. Once completed the flyover will ease vehicular congestion at the junction where Madurai-Theni road and Madurai-Dindigul bypass road cut across.
The flyover will be constructed on Madurai-Dindigul Bypass Road in 15 months.
In addition, the state government has ordered a re-survey for the bridge proposed to decongest traffic at Goripalayam junction.
The flyover will be built on Thondi Road-Sivaganga Road junction. The cost of the project is Rs 56 crore. The northern bank road along Vaigai river connecting Kuruvikkaran Salai Bridge and PTR Bridge in Anna Nagar will be constructed at a cost of Rs 16.3 crore.
Apart from this, the government has announced construction of sewage treatment plants (STPs) in the city to prevent sewage water into Vaigai river.
A road along the Vaigai as a service road parallel to the road over bridge at Sellur to connect Kulamangalam Road will be constructed. The project will be developed at a cost of Rs three crore.
