Illustrative image – not actual.On 07 June 2013, Sheila Dikshit, Chief Minister of Delhi, laid the foundation stone for the elevated road from Prem Bari Pul and Azadpur, Delhi.
The proposed 2.1 km stretch from Prem Bari Pul to Azadpur consists of a 1.6 km long and 24.2 m wide elevated road. The project is expected to cost Rs 247 crore. The elevated road at Azadpur will begin after the underpass at Prem Bari Pul and end before the Azadpur railway over-bridge, thus helping to decongest areas such as Ashok Vihar, Shalimar Bagh and Wazirpur.
Work on the project has commenced and is likely to be completed by 2015.
In addition, Sheila Dikshit inaugurated four newly built foot-over-bridges -- opposite Indira Gandhi Poly Clinic; Shakarpur; J J colony; and Ring road.
Related Link:
Project profile
