Illustrative image – not actual.
Prime Minister Narendra Modi unveiled the foundation stone of Buxar Thermal Power Project digitally from Greater Noida on 9 March 2019.
The two x660 MW Buxar Thermal Power Project will come up in Buxar district of Bihar.
On 7 March 2019, the Cabinet Committee on Economic Affairs (CCEA) chaired by Prime Minister gave approval for investment on Buxar Thermal Power Project.
The project will see an investment of Rs 10,439.09 crore. It will be implemented by SJVN Thermal, a wholly owned subsidiary of SJVN, a Mini Ratna CPSU under Ministry of Power, government of India.
The thermal power project will be based on super critical technology and will be equipped with latest emission control technology to protect the environment and has high efficiency and use less fuel to generate power.
The project will improve the deficit power scenario in Bihar and eastern region. It will start yielding benefits from 2023-24.
The project is based on super critical technology, closed cycle water re-circulation system for zero discharge concepts.
The coal requirement for the project has been tied-up and will be supplied by Central Coal (CCL), while the State Transmission Utility, Bihar has already approved power evacuation system for the project.
The project will push industrial development of the region and generate direct and indirect jobs for many.
