Illustrative image – not actual.
Union Road Transport and Highways Minister Nitin Gadkari laid foundation stone for the Rs 2,700 crore cable-stayed parallel bridge on Zuari river in Goa.
The bridge on Zuari, one of the major rivers flowing through the coastal state, was required after the old structure was considered unfit to carry heavy vehicles.
Foundation stone was also laid for Rs 298 crore Canacona bypass with three bridges, Rs 297 crore Margao bypass and Rs 187 crore Verna missing link.
The eight-lane parallel Zuari bridge is expected to be completed in two years and the tenders for the same will be opened in January 2016.
