Illustrative image – not actual.Sonia Gandhi, UPA Chairperson, on 23 May 2011, laid the foundation stone for the cable-stayed bridge at Basohli, Kathua district, Jammu & Kashmir.
Border Roads Organisation is the promoter of the bridge, which is to be constructed at a cost of Rs 145 crore by IRCON-SPS Construction.
The two-lane class A bridge with 13.93 mtrs width will have 1.5 mtr wide footpaths on either side. The length between towers will be 350 mtrs and approaches 121 mtrs. The height of pylons is designed to be 88 mtrs above the deck level. The 592-mtrs bridge will connect the states of Punjab, Himachal Pradesh and Jammu & Kashmir, besides opening a new strategic route in the region. Work on the project is slated to be completed by September 2014.
