Illustrative image – not actual.
Union Minister for Road Transport & Highways, Shipping and Water Resources, River Development and Ganga Rejuvenation Nitin Gadkari laid the foundation stone for development of a six-lane, access-controlled corridor from Akshardham in East Delhi to the Eastern Peripheral Expressway junction on Baghpat Road on 26 January 2019.
The 31.3 km road stretch is part of NH-709B which will run from Akshardham to Saharanpur Bypass. The alignment of the road will be from Akshardham-Geeta Colony-Shastri Park-Khazuri Khas-Delhi/UP border-Mandola-EPE Intersection.
The project will be developed in two packages. In the first package a 14.75 km stretch from Akshardham to Delhi/UP border and in the second package 16.57 km stretch from Delhi/UP border to EPE Intersection will be developed.
The project will have 19 km elevated section. The estimated cost is Rs 2,820 crore.
The project involves construction of three+three-lane service roads on either side of the highway, eight new underpasses, seven ramps connecting major roads, 15 major junctions, 34 minor junctions, and over-bridges at Delhi-Shahdara, New Delhi-Anand Vihar railway lines and Dilshad Garden-ISBT Metro Line.
The high-speed signal-free corridor is expected to decongest and considerably reduce pollution levels in Delhi NCR.
Road projects worth Rs 50,000 crore have been sanctioned for around Delhi. Apart from this, the 90 km Delhi-Meerut Express Highway will be operational by April 2019 and work on Dwarka Expressway is being taken up at a cost of Rs 10,000 crore.
