Illustrative image – not actual.The foundation stone for Kadapa-Bengaluru railway line is likely to be laid soon.
The 258.30-km railway line is estimated to cost Rs 1,785 crore. The Indian Railways and state governments are likely to bear the cost on 50:50 basis. In the current fiscal year, a sum of Rs 80 crore has been sanctioned for the project.
The project covers 200 km in Andhra Pradesh and 50 km in Karnataka. The new railway line is likely to pass through Kadapa and Chittoor districts in Andhra Pradesh and Kolar district in Karnataka and will join the Pakala-Dharmavaram line at Madanapalle in Andhra Pradesh. The line is to have 54 major bridges and 315 minor bridges besides 18 crossing stations and 13 halt stations.
