Illustrative image – not actual.Prime Minister Dr. Manmohan Singh is expected to lay the foundation stone for the dedicated railway freight corridor on 27 September 2006, at Ludhiana.
Phase I of the Rs.66,000 crore project will be launched in Mumbai on 6 October 2006. Dedicated multi-modal high axle load freight corridors with computerised control are proposed on western and eastern routes at an estimated cost of Rs.22,000 crore each.
In the first phase of eastern corridor project, a separate freight corridor will be built from Ludhiana (Punjab to Sonnagar (West Bengal) via Ambala, Sharanpur, Khurja and Allahabad. Considering the possibility of increase in freight traffic on account of proposed deep sea port, this corridor will be later extended up to the proposed port in Kolkata.
The western corridor will start from Jawahar Lal Nehru Port and will be routed via Vadodara, Ahmedabad, Palanpur, Jaipu and Rewari to Tughlakabad and Dadri. Reliance Group is also planning to participate in developing the western freight corridor connecting Delhi-Mumbai, which will cost between Rs.25,000 crore and 30,000 crore, in partnership with railways.
The freight corridor project will be implemented through a special purpose vehicle route which has already been cleared by the Union Cabinet.
Also See:
Railway Freight corridor: Cabinet approves SPV (25-Aug-06)
Related Links:
Project
profile
