FoB to come up connecting Udyog Vihar with Cyber CityIllustrative image – not actual.
A foot over bridge (FoB) will be developed connecting Udyog Vihar with Cyber City in the state of Haryana.

The Gurugram Metropolitan Development Authority (GMDA) has sought suggestions from the public on development of the FoB connecting the industrial hub with the Rapid Metro stations and Cyber City.

The project is being developed by DLF Cyber City at an estimated cost of Rs 24 crore. The FoB will be a covered walkway with a width of five mtr, and lifts and escalators on both ends.

The total area required for developing the FoB is 1,750 sq mtr which will be provided to the developer.

The FoB is expected to be completed by October 2020. The project was first proposed in 2015 by the Rapid Metro management.

Apart from this, DLF has also proposed a skywalk connecting the FoB with the Income Tax building in Udyog Vihar Phase-5.

The proposed skywalk will be 350 mtr long and cost around Rs 12 crore.

← All latest storiesBack to top →