First trial run of Chennai Metro Phase-II network conductedIllustrative image – not actual.

The Chennai Metro Rail Project marked a milestone with the first trial run of a driverless train on Line 4 of Phase-II.

Although the train is designed to be driverless, a driver operated it at a speed of 15 kmph for the trial. Daily trials are expected to continue, as per an official. This section, from Poonamallee Bypass to Mullaithottam, is part of the 26.1-km Corridor 4, stretching from Poonamallee Bypass to Light House.

Construction and system installation work is progressing along a nine-km stretch between Poonamallee Bypass and Porur Junction.

← All latest storiesBack to top →