Illustrative image – not actual.The train has been flagged off on the 11 km section having six Metro stations between Lokmannya Nagar Metro Station and Sitabuldi Interchange. With the opening of this section of Aqua Line, a total of 24.5 km Metro rail network now becomes operational for the public which is about two-thirds of the total network of Phase-I of Nagpur Metro Rail project.
The 13.5 km section of Orange Line was inaugurated by Prime Minister Narendra Modi on 7 March 2019. The 11 km section of Aqua line on Reach III has 11 operational stations namely Lokmanya Nagar, Vasudev Nagar, Subhash Nagar, Institution of Engineers, Jhansi Rani Square and finally Sitabuldi Interchange. The last five stations, namely Bansi Nagar, Rachana Ring Road, Ambazari Lake View, LAD Square, Shankar Nagar, are expected to open in April 2020.
The North-South corridor of the Nagpur Metro Rail which was opened earlier is known as the Orange Line. The East-West corridor is known as Aqua Line as it passes through the water body of Nagpur-Ambazari Lake, Gandhi Sagar, and Nag River.
A road journey between Lokmanya Nagar and Sitabuldi presently takes over 45 minutes, Nagpur Metro will reduce this time drastically by more than half.
