Illustrative image – not actual.The Maharashtra Chief Minister, Mr Vilasrao Deshmukh, inaugurated the first phase of the Goregaon Sports Club in Mumbai, on 28 October 2001.
The first phase includes the following features:
1.
Olympic size swimming pool – 25 mt x 50 mt (10 lanes)
2.
Olympic size diving pool (18’ depth) with underwater cameras
3.
Kiddies pool with water game facilities
4.
Gallery overlooking swimming pool for 300 viewers
5.
Gymnasium and health club (separate for gents and ladies)
6.
Cardio vascular centre, under guidance of professionals
7.
Fast food corner and air-conditioned restaurant
8.
Six acres open ground for cricket, football, volleyball, kabaddi and
kho kho grounds
The second phase, to be completed by March 2002, would include the following features:
1. A 10,000 sq ft (90’ x 110’ x 35’ ht) air-conditioned multi-purpose indoor game hall having four badminton courts, volleyball, basketball and gymnastics with gallery to accommodate 500 spectators
2.
A 10,000 sq ft roof terrace garden as function area
The third phase, to be completed by March 2003, would include the following features:
1.
Three glass squash courts
2.
Indoor game hall for table tennis, billiards, snooker and other indoor games
3.
Permit room and restaurant (separate)
4.
Sports library
5.
Card room
6.
Banquet hall
7.
20 double bed air-conditioned rooms
