Illustrative image – not actual.Monnet Ispat & Energy has targeted to attain financial closure for its 1,000 MW coal-based power project in Orissa by end-January 2007.
The company has also planned to float a new special purpose vehicle, Monnet Power Co Ltd, for the power project. Kotak Mahindra is conducting a valuation exercise to this effect and a final decision is likely by mid-November 2006.
MIEL entered into an MoU with the Orissa government in September 2006 for the proposed power project. It will source coal from the Utkal B2 captive block in the Talcher coalfields. The 1,000 MW project to come up in Angul district in two phases of 600 MW and 400 MW is likely to cost Rs.4,200 crore.
(Note: Monnet Ispat & Energy is the new name of Monnet Ispat)
Also See:
Orissa signs MoU with 10 IPPs, REL stays away (27-Sep-06)
Related Links:
Project
profile
