Final Location Survey conducted for new BG rail connectivity to Char DhamIllustrative image – not actual.
Union Minister of Railways Piyush Goyal took a survey of last-mile connectivity plans for Char Dham projects.
 
The Final Location Survey (FLS) for new Broad Gauge (BG) rail connectivity to Char Dham, i.e. Gangotri, Yamunotri, Badrinath and Kedarnath in Uttarakhand is near completion.
 
While reviewing the last mile connectivity plans for the Indian Railways’ Char Dham project, the Railway Minister noted that pilgrims must get safe, fast and comfortable last leg connectivity with Char Dham destinations.
 
The concerned officials were directed by the Minister to do a detailed review of all the alternatives considering comfort and safety of the public.
 
Also, comprehensive planning for the project needs to be done to cater to the need of tourism as well as to make it convenient for pilgrims to reach the temple timely and safely.
 
Kedarnath and Badrinath railway connectivity will take off from Karnaprayag railway station which is a part of 125 km long Rishikesh-Karnaprayag new BG rail line project is under construction at full swing; while Yamunotri and Gangotri rail connectivity will take off from the existing Doiwala station. 
 
As per the connectivity survey of Char Dham BG Rail, the terminal stations of the new railway line are terminating at Uttarkashi, Barkot, Joshimath, Soneprayag, which are short of Char Dham temples due to steep terrain as well as limitation of BG ruling gradients.
 
Reconnaissance Engineering Survey (RES) is being carried out for connecting new Broad Gauge railway terminal stations to Dhams.
← All latest storiesBack to top →