Illustrative image – not actual.Fifteen global telecommunication companies along with Bharti Airtel signed the formal construction and maintenance agreement (C&MA) to build the first direct, high-bandwidth optical-fibre submarine cable system from UK to India.
To be set up at an investment of $700 million, the Europe India Gateway (EIG) cable system will become operational in second quarter of 2010. The EIG cable system is a 15,000 km (9,000 mile) system that will connect 13 countries and three continents with landings planned in the UK, Portugal, Gibraltar, Morocco, Monaco, France, Libya, Egypt, Saudi Arabia, Djibouti, Oman, United Arab Emirates and India.
The other members of the EIG cable consortium include AT&T, BT, C&W, Djibouti Telecom, Du, Gibtelecom, IAM, Libyan Telecom, MTN Group, Omantel, PT Comunicacoes, Saudi Telecom, Telecom Egypt, Telkom and Verizon Business.
The state-of-the-art, next generation cable system is designed to provide up to 3.84 terabits (Tbps) using dense-wavelength-division-multiplexing (DWDM) technology to provide upgradeable transmission facilities that support Internet, e-commerce, video, data and voice. The EIG cable system will, hence, provide the much needed diversity for broadband traffic currently relying largely on traditional routes from Europe to India.
In addition to the C&MA signing, the EIG consortium also signed a supply contract with Alcatel-Lucent and Tyco Telecommunications for the cable system's construction.
