Illustrative image – not actual.On 19 September 2007, Gail India signed the feedstock supply agreements for the Rs.5,460 crore, 2.80 lakh tpa gas cracker plant being set up at Lepetkata in Dibrugarh district of Assam
The gas supply agreement was signed between Brahmaputra Cracker & Polymer (BCPL), and Oil India and naphtha supply agreement was signed between BCPL and Numaligarh Refineries (NRL).
Under the feedstock supply agreements, BCPL will source 6.0 mmscmd gas from Oil India, Duliajan which shall be processed to recover C2+ Liquid as feedstock for the petrochemical complex. The balance gas after recovery of C2+ Liquid shall be returned back to the gas consumers. The petrochemical complex shall also utilize 1.6 lakh tpa of petrochemical grade naphtha from Numaligarh Refinery. In addition to fuel supplies from OIL and NRL, 1.35 mmscmd gas from Oil & Natural Gas Corporation upto 31 March 2012 and 1.00 mmscmd thereafter will be utilized by BCPL.
The petrochemical complex will comprise of a cracker unit, downstream polymer and integrated off-site/ tilities plants. The complex has been configured with a capacity of 2.2 lakh tpa of ethylene and 60,000 tpa of propylene with natural gas and naphtha as feed stock. The existing company's LPG plant at Lakwa will be modified to process gas for recovery of ethane and higher hydrocarbon fraction which will be transported to Lepetkata through a pipeline.
Related Links:
Project profile
