FEDO completes consultancy services on IOC’s Orissa facility Illustrative image – not actual.

The FACT Engineering and Design Organisation (FEDO), the engineering consultancy division of FACT, has completed work on mega crude and product storage facility in Orissa.


FEDO has completed project management consultancy services on the Rs 2,700-crore mega crude and product storage facility of the Indian Oil Corporation’s refinery project located at Paradip in Jagatsingpur district of Orissa. Apart from consultancy services, FEDO carried out project management, review of detailed engineering, procurement services and construction management and supervision for setting up the product storage facility.


The storage facility set up over 3,344 acre includes eleven crude oil floating roof tanks of diameter of 79 mtrs each and 13.6 mtrs height, with capacity of 59,555 cu mtrs. There are also 25 product tanks with capacity upto 38,284 cu mtrs and 15 pressurised LPG/ propylene bullets, each with a capacity of 1,300 metric tonne of  PG/propylene. The facility is a part of the15-million tonne per annum refinery being set up by Indian Oil Corporation at a cost of Rs 30,000 crore. 

 

Related Link:
Project profile

 

← All latest storiesBack to top →