Illustrative image – not actual.The Bangalore Metro Rail Corporation (BMRCL) is set to submit a feasibility study for Bengaluru’s longest proposed metro corridor, a 73-km elevated line stretching from Kalena Agrahara in the south to Kadugodi Tree Park in the east.
Prepared by Introsoft Solutions, the study charts a route through fast-growing southern and eastern tech suburbs, including Bannerghatta, Jigani, Attibele, Sarjapur, Dommasandra Circle, and Varthur Kodi, effectively linking the city’s booming technology corridors in a single arc. A notable feature is a five-km spur line directly connecting to a proposed international cricket stadium in Anekal, which will host an 80,000-seat stadium, facilities for 24 sports, and a 30,000-seat auditorium. The spur will include stations at the stadium and Indlavadi to serve surrounding areas. The corridor will have more than 50 stations, spaced wider apart due to developing neighbourhoods. Construction is not expected to start before 2029, with a projected timeline of five to 10 years.
The project is part of BMRCL’s broader 210.9-km expansion plan, which will extend Bengaluru’s metro network to nearly 468 km, making it comparable in scale to Delhi-NCR’s system and offering relief to the city’s severe traffic congestion.
