Illustrative image – not actual.The Northeast Frontier Railway has ordered a feasibility study for the 30 km railway line linking Byrnihat in Meghalaya and Azara, near the Guwahati airport in Assam. The study is expected to take six months.
The Byrnihat-Azara railway line is estimated to cost Rs.180 crore.
