Feasibility study ordered for Byrnihat-Azara railway lineIllustrative image – not actual.

The Northeast Frontier Railway has ordered a feasibility study for the 30 km railway line linking Byrnihat in Meghalaya and Azara, near the Guwahati airport in Assam. The study is expected to take six months.

 

The Byrnihat-Azara railway line is estimated to cost Rs.180 crore.

← All latest storiesBack to top →