Illustrative image – not actual.The MoEF has learnt to have decided to get studies conducted by IIT Roorkee and the Wildlife Institute of India (WII), Dehradun, on feasibility of proposed hydel power projects on the Bhagirathi and Alakananda rivers in Uttarakhand.
The review of environmental impact assessments of individual hydel power projects have been made on a standalone basis. However, a series of hydro electric projects are planned, under implementation and operational on Bhagirathi and Alaknanda rivers, the MoEF has been decided that a comprehensive study may be undertaken on the likely cumulative impact of the projects on the flow and character of the river.
The study is likely to determine the requirement of minimum flow from the proposed and already commissioned hydel power projects on these rivers in their entire stretch.
The Ministry also felt that cumulative environmental impact of various hydel power projects on the riverine eco system in general and terrestrial and aquatic biodiversity, in particular along with a review of the effectiveness of the mitigative measures and compliance of the stipulated conditions on which various projects have been cleared needs to be undertaken.
As a result, it has been decided that the Forest Conservation Division of the Ministry will itself commission the study involving WII, Dehradun, and other appropriate institutions.
