Feasibility study completed for Mombasa Gate bridge projectIllustrative image – not actual.
The feasibility study for the Mombasa Gate bridge linking the island to the south coast has been completed.

The project worth USD 777.8 million will be completed in four years.

As per the design of the project, the cable-supported bridge will be 69 mtr from the highest water level and 1.4 km long.

The total length of the road will be 10.5 km. The road will comprise four lanes along with side walks for pedestrians.

← All latest storiesBack to top →