Essar Oil has stuck oil in its Mehsana onshore exploration block CB ON-3 in Gujarat. This is the second oil discovery in the block by Essar, the first being in March 2007.

The in-place reserve of the first discovery was an estimated 18 million barrels of oil and oil equivalent with recoverable reserves in the range of 2.8 million barrels of oil equivalent. Essar is producing around of 500 barrels of oil a day from the March discovery.

Essar has discovered oil in the well, ENM-1, in the Mehsana exploration block, using the heater treater technology. The well is expected to produce around 50-60 barrels of oil a day and the plan is to drill another 6-7 prospects shortly to produce around 300-400 barrels of oil a day. The crude oil discovered is heavy in consistency, unlike the medium-quality oil produced by Essar from its first discovery in the block. Essar has started selling 500 barrels of oil a day from its first discovery to Indian Oil Corporation's Koyali refinery in Gujarat.

The CB-ON3 block was awarded to Essar Oil in 1998 and is located in the petroliferous Cambay Basin in Gujarat. Essar, which is the operator, holds 70 per cent in the block, while ONGC has the remaining 30 per cent.

Also See:

Essar Oil to commence drilling in onshore block by November (08-Jul-07)

← All latest storiesBack to top →