Essar Oil starts oil production from Mehsana wellsIllustrative image – not actual.

On 9 June 2007, Essar Oil will start producing 500 bpd of oil from two wells at Mehsana in Gujarat.

 The Directorate-General of Hydrocarbons (DGH), has given its formal approval to the field development plan on 8 June 2007. Production is expected to reach 1,000 bpd by September 2007, following drilling of two more development wells. The crude will be supplied to Koyali refinery of Indian Oil.

The company has struck oil at two wells at prospect B in CB-ON/3 pre-NELP block in Mehsana in 2006. The recoverable reserve is estimated at 2.7 million bpd of oil. The company have launched 3D seismic survey of an additional 145 sq.km area within the block. The results of the survey are awaited, depending on which we will drill other prospects - if any - in the block

Essar Oil holds 70 per cent operating interest in the 574 sq.km onshore block in the Cambay basin. ONGC is a natural partner with 30 per cent stake. Meanwhile, the company has secured a six months extension of its Phase-I coal-bed methane (CBM) exploration programme at the Eastern Ranigunj (CBM) block in West Bengal. The programme is now scheduled to end-September 2007.

Also See:

Essar Oil discovers oil at Mehsana Block CB1/3 (21-Dec-06)

← All latest storiesBack to top →