Essar Oil commissions Vacuum Gas Oil hydrotreating unit at Vadinar refineryIllustrative image – not actual.

Essar Oil, on 21 March 2012, announced the commissioning of its new vacuum gas oil hydrotreating unit (VGOHDT) and sulphur recovery unit (SRU) at its Vadinar refinery in Gujarat.

The SRU will help the refinery recover 99.9 per cent of sulphur in acid gases generated from the ARU (Amine Regeneration Unit) and the SWS (Sour Water Stripper), two units that have already been commissioned. The 6.5 million tpa VGOHDT unit will ensure that the refinery is able to achieve a throughput capacity of 18 million tpa. It will help the refinery produce low sulphur, high octane gasoline (petrol). The unit is also capable of producing naphtha, kerosene and gas oil (diesel).

With the commissioning of these two units, delayed coker unit (DCU) is the only expansion unit that remains to be commissioned as part of the company’s Rs 8,300-crore Phase I expansion project. The project is to be fully completed soon. It will expand the capacity of the refinery to 18 million tpa and enhance complexity to 11.8 (from 6.1 currently), which is amongst the highest in the world.

Related Links:
Project profile

← All latest storiesBack to top →