Essar Constructions bags Rs.186 crore contract from BORLIllustrative image – not actual.

Essar Constructions (India), a subsidiary of Essar Projects has secured a Rs.186 crore contract from Bharat Oman Refineries for laying 504 km of a 930 km, 24 inch crude oil pipeline for Bina refinery in Sagar district of Madhya Pradesh.

ECIL will execute the longest section comprising three stretches totalling 504 km - from Vadinar to the Gujarat-Madhya Pradesh border. The scope of work includes residual engineering, laying of the 24-inch pipeline, including building of a dispatch terminal, intermediate pumping stations and sectionalising valve stations.

The 930 km pipeline will stretch from Vadinar in Gujarat to Bina in Madhya Pradesh, where BORL, a joint venture of Bharat Petroleum Corporation and Oman Oil Corporation, is putting up a refinery.

Related Links:
Project profile

← All latest storiesBack to top →