Era consortium bags Rs.550 crore road projectIllustrative image – not actual.

Era Infra Engineering (EIEL) in consortium with KCT bagged an order worth Rs.550 crore for executing the Delhi-Bahadurgarh-Rohtak stretch in Haryana.

This stretch of NH-10 will start from km 29.70 upto km 87.00. It entails the construction of a 63.49 km stretch including a new four-lane bypass for Bahadurgarh and Rohtak and six-lane highway between Bahadurgarh and Rohtak from existing two-lane highway on BOT basis. The bypass of Bahadurgarh would be 13 km long and bypass of Rohtak would be 25 km. This will also include the construction of five grade separators, four underpasses and three railway overbridges.

West Haryana Highways Projects Pvt Ltd is the special purpose vehicle floated by the KCT-Era consortium. The project is scheduled to be completion within a period of two years.

Related Links:
Project profile

← All latest storiesBack to top →