Illustrative image – not actual.Himachal Pradesh Power Corporation has invited EoIs for work related to the Shongtong-Karchham hydroelectric power plant at Kinnaur district.
EoIs have been invited to carry out exploratory drilling and logging of boreholes on the right bank slopes of river Staluj, adjacent to barrage and reservoir area of the project, with 450 MW capacity.
The scope of work involves executing geological exploration by drilling / driving (using wire line core drilling) three drill holes and proper storage of core recovered from these drill holes in wooden core boxes.
Himachal Pradesh Power Corporation is investing Rs 2,500 crore to execute the project.
Related Link:
Tender
