Illustrative image – not actual.Electrosteel Castings (ECL) has floated a special purpose vehicle (SPV) - Electrosteel Integrated Ltd - to set up a 1.3 million tpa integrated steel plant in Jharkhand. The project will entail an investment of around Rs.4,900 crore.
On 7 May 2007, the Electrosteel Castings board approved to infuse about Rs.500 crore (out of the total cost project) as equity into the SPV. The investment will be taken up in a phased manner over a period of 30 months.
The plant will produce long products like structural, bars and rods.
Also See:
Electrosteel to invest Rs.440 crore in West Bengal (06-Sep-05)
