Illustrative image – not actual.Narmada Water Resources, Water Supply & Kalpsar Department is implementing Kakrapar-Gordha-Vad Lift Irrigation Scheme in the state of Gujarat on EPC basis.
In September 2016, bids were invited from contractors to execute the project. The project was awarded to Larsen & Toubro (L&T) in April 2017 for which scope of work included design and construction of pumping station with pumps, substations, transformers along with MS pipelines rising mains, an underground pipeline distribution network and other allied electro-mechanical works.
Following this the work on the project commenced. As per the latest update available with Projects Today, around 80 percent work on the project has been completed.
The estimated cost of the project is Rs 511.24 crore. The project is expected to be completed by 31 May 2020.
In September 2016, bids were invited from contractors to execute the project. The project was awarded to Larsen & Toubro (L&T) in April 2017 for which scope of work included design and construction of pumping station with pumps, substations, transformers along with MS pipelines rising mains, an underground pipeline distribution network and other allied electro-mechanical works.
Following this the work on the project commenced. As per the latest update available with Projects Today, around 80 percent work on the project has been completed.
The estimated cost of the project is Rs 511.24 crore. The project is expected to be completed by 31 May 2020.