Durga Infra Mining wins extraction and transport contract for Prakashamkhani OC projectIllustrative image – not actual.

Durga Infra Mining has secured a large mining contract for operations at the Prakashamkhani Opencast Project (OC-IV Section) in Manuguru area in Telangana.

The contract involves extensive overburden removal, coal extraction, and allied mining services to be executed over a period of 36 months.

The scope includes drilling, excavation, loading, transportation, dumping, spreading, and levelling of 771.90 lakh bank cubic metres (lbcm) of in-situ overburden, comprising 747.26 lbcm of hard overburden and 24.64 lbcm of coal. It also includes re-handling of 84.91 lakh cubic metres (lcm) of loose overburden and 8.38 lcm of loose top soil using conventional equipment.

Additionally, the contract covers extraction of 91.39 lbcm of coal and shale using surface miner technology, including cutting, loading, transportation, and dumping operations. Supporting work includes 1,500 shovel hours, 1,500 dozer hours, 5,000 tipper hours, and 1,25,000 running metres of drilling activity.

The project, managed by Singareni Collieries Company is expected to enhance production efficiency at the opencast mine through mechanised operations and large-scale material handling. The long-term contract strengthens Durga Infra Mining’s presence in coal mining services and supports continuous extraction and overburden management operations in the region.

← All latest storiesBack to top →