Dredging work of Varuna Corridor project beginsIllustrative image – not actual.

The Irrigation department has launched the Varuna Corridor project in Varanasi for revival of the stream of Varuna and its beautification, on 27 March 2016, by starting the dredging works.

On the first day, two giant machines were engaged near Shastri Ghat at Varunapul, while one machine started dredging near Chowkaghat bridge. Work is also in progress to create a drain in the middle of the river bed to drain out water.

← All latest storiesBack to top →