Illustrative image – not actual.The detailed project report (DPR) for the proposed elevated corridor at Ainthapali area in Odisha was submitted to the National Highways Authority of India (NHAI).
The elevated corridor on NH-53 was envisioned in view of heavy traffic on busy stretch of the road. As per the plan the elevated corridor, originating from the Bharat Petroleum Corporation (BPCL) petrol pump on the opposite side of the bus terminus and ending near the Income Tax Office, will be around two km in length.
It will also provide an alternative route to most commuters and eventually address the issue of traffic congestion in the area.
A Bhubaneswar-based consultancy firm, SM Consultants, was assigned the task of preparing the DPR.
