Illustrative image – not actual.The DPR for a coal gasification project-cum-fertilizer plant at Talcher in Orissa is to be prepared soon.
The project entailing an estimated investment of Rs 8,000 crore is being planned by a consortium of three companies- CIL, GAIL and Rashtriya Chemicals and Fertilizers. Each of the three companies will have an equal stake in the project.
The DPR is likely to be prepared by Central Mine Planning and Design Institute, a fully owned subsidiary of CIL.
A coal block at Talcher Coalfields under the Mahanadi Coalfields, a subsidiary of CIL, has been identified for the surface-based coal gasification project. This coal block has a capacity of 5.5 million tpa and once washed, it will yield 3.7 million tonne.
Meanwhile, CIL had also planned an underground coal gasification project with ONGC. The coal block identified for the coal gasification project is spread over an area of four sq km and it is located in the command area of Eastern Coalfields, a subsidiary of CIL.
Also See:
Talcher fertiliser plant faces hurdles (14-April-10)
Related Links:
Project profile
