Illustrative image – not actual.
Kerala's infrastructure project -- a 430 km long high speed rail corridor connecting the state capital and Kannur -- is moving to the next step with a report on its viability and feasibility being looked at.
Once ready, the rail line is expected to cover the distance in two hours’ time, while normal trains that run on this route take 12 hours.
Kerala High Speed Rail Corporation stated that the detailed project report prepared by the Delhi Metro Rail Corporation is being looked into.
