DPR being prepared for Visakhapatnam-Bhogapuram Beach CorridorIllustrative image – not actual.
The detailed project report (DPR) for Visakhapatnam-Bhogapuram Beach Corridor is being prepared. 
 
The Andhra Pradesh government had proposed to develop the existing beach road connecting Vizag Port Container Terminal to NH-16 at Bhogapuram via Rishikonda and Bheemili to six-lane standards. 
 
On 24 December 2020 the Road Ministry had directed NHAI to initiate the preparation of the DPR.
← All latest storiesBack to top →