Illustrative image – not actual.The Delhi government has announced that the city’s first double-decker flyover in northeast Delhi is expected to be completed by December 2026.
Chief Minister Rekha Gupta approved the revised project estimate of Rs 291 crore, increased from the earlier approved cost of Rs 220.10 crore, during an Expenditure Finance Committee (EFC) meeting. The integrated structure is being developed by the Delhi Metro Rail Corporation (DMRC) between Yamuna Vihar and Bhajanpura Metro stations, combining a road flyover and Metro corridor within a single project. The 1.40 km-long structure will include a six-lane elevated corridor, a pre-cast viaduct, and 140-metre-long ramps on both sides. The project has entered its final phase, with several key construction activities remaining before completion. The initiative is supported by a MoU signed between the Public Works Department (PWD) and DMRC in February 2021. Along with the flyover, the project includes supporting infrastructure such as new roads, footpaths, signage, electrical works, drainage systems, and rainwater harvesting facilities.
The development is expected to improve traffic movement, enhance connectivity, and provide integrated transport infrastructure for northeast Delhi residents.
