DMRC to conduct feasibility study for double-decker flyoverIllustrative image – not actual.

The Delhi Metro Rail Corporation (DMRC) will conduct a feasibility study for developing an integrated double-decker flyover-cum-metro corridor on the proposed 16.5-km Keshav Puram-Rohini Sector 34 route under Phase V(B) of the Delhi Metro network.

The consultancy project, estimated at around Rs 2.08 crore, will examine the possibility of constructing metro infrastructure on the upper deck and an elevated road or flyover on the lower deck to improve connectivity and reduce traffic congestion. The study is expected to be completed within six months and will evaluate alignment options, traffic demand, structural feasibility, construction challenges, utility constraints, and commercial viability. The appointed consultant will undertake traffic surveys, origin-destination studies, public transport assessments to develop a comprehensive transport model and will also prepare conceptual designs, estimate land needs, and provide preliminary cost projections. The proposed corridor passes through densely populated areas of northwest Delhi, requiring careful planning due to existing flyovers, metro structures, land limitations, utilities, and busy intersections.

The project aims to create an integrated transport solution combining Metro expansion with road infrastructure improvements.

← All latest storiesBack to top →