DJB earmarks Rs.2,454 crore for revamping sewerage systemIllustrative image – not actual.

The Delhi Jal Board (DJB) has launched Rs.2,454 crore 'interceptor' scheme to completely change Delhi's sewerage system.

The newly launched scheme will put in place new sewage lines to take in overflows from existing lines as well as the un-sewered areas of the city, and direct it to treatment plants. Apart from this, the plan also promises to clean up the river Yamuna. The work on the sewerage system is likely to begin by March and it will be completed by January 2012.

The DPR has been prepared by the Engineers India. As per the DPR, implementation of the interceptor sewer project on an experimental basis at Najafgarh drain has resulted in improvement of the water quality in the river Yamuna. The interceptor sewer will convey waste water from diversion structures from un-sewered areas as well as overflows from the existing sewers and direct it to the nearest sewer treatment plant. The project has been designed in such a manner that it will be able to withstand the pressure on it from an estimated population of 2.3 crore in the year 2021.

← All latest storiesBack to top →