Dishnet DSL prunes its undersea cable costIllustrative image – not actual.

Dishnet DSL has pruned its undersea cable project cost from $1.2 billion to $250 million (Rs.1,200 crore). The reduction in cost has been due to falling prices and lighting up, partial utilization of the capacity is known as lighting up.

 

The planned capacity of the cable is 7.68 terabits per second, but the company plans to use only 160 gigabits per second. The project has an equal debt and equity component. The company was talking to US Exim bank to fund the debt portion but the talks failed to materialize.

 

The company plans to first link Chennai and Singapore and then US via Japan. It may be recalled that the original plan was to link Singapore and Indonesia.

 

In another development, the company has signed a contract with SingTel for international capacity. Capacity of this cable is expected to be 8.4 terabits, which would connect Chennai to SingTel Internet Exchange.

 

Related stories:

Dishnet in talks with FIs.

← All latest storiesBack to top →