Illustrative image – not actual.
Dilip Buildcon and Vijay Kumar Mishra Construction's joint venture (JV) has received a letter of acceptance (LoA) from the Water Resource Department (WSD) for the construction of Malhargarh pressurised micro-lifting major irrigation project in Mandsaur district of Madhya Pradesh.
The 46,500 ha irrigation project involves the preparation of construction drawings and design and obtaining approval from the competent authority, including the construction of all civil, mechanical and electrical works.
The contract, costing Rs 699.03 crore, will be executed on a turnkey basis and is expected to be completed in 36 months, with management, operation and maintenance (MOM) to be carried out for 60 months after completion.
