Dilip Buildcon receives LoA for four-laning of Sannur to Bikarnakette sectionIllustrative image – not actual.
Dilip Buildcon (DBL) has received letter of acceptance (LoA) for four-laning of Sannur to Bikarnakette section. 
 
The scope of work includes four-laning of Sannur to Bikarnakette section from the existing 698.850 km (design 691.350 km) to existing 744.190 km (design 736.362 km) of NH-169 under Bharatmala Pariyojana on hybrid annuity mode (HAM) in the Karnataka (Package-III). 
 
The bid project cost is Rs 1,137 crore with a completion period of 24 months. The operation period is 15 years from the COD.

 

← All latest storiesBack to top →