Dilip Buildcon-HCC JV receives LoA for EPC project in BiharIllustrative image – not actual.

Dilip Buildcon-HCC JV has received letter of acceptance (LoA) from the National Highways Authority of India (NHAI) for EPC project in Bihar.

The scope of work involves construction of new link NH-133B from 0.200 km (200.700 km of Sahibganj Bypass) in Jharkhand to 15.885 km (25.240 km of NH-131A) including Ganga Bridge and construction of Manihari Bypass from 0.000 km (25.240 km of NH-131A) to 5.500 km (34.100 km of NH-131A near Narenpur) and widening of NH-131A from 5.500 km (34.100 km of NH-131A)  to 6.000 km (34.600 km of NH-131A) to four-lane.

The cost of the project is Rs 1,900.08 crore with a completion period of 48 months. The length of the road project is 21.685 km long.

← All latest storiesBack to top →