Illustrative image – not actual.Dilip Buildcon (DBL) has been declared the lowest (L1) bidder by National Highways Authority of India (NHAI) for a road project in Maharashtra, under NHDP Phase IV-B.
The scope of the project involves four /six laning of Karodi (320.104 km) to Telwadi (375.000 km) road section of NH 211 (new NH 52); (existing length 54.896 km; design length 55.610 km) in Maharashtra, under NHDP Phase IV-B, on EPC mode.
The bid price for the project is Rs 565.02 crore. The completion period is 30 months.
