Dilip Buildcon declared L1 bidder for railway project in BilaspurIllustrative image – not actual.
Dilip Buildcon has been declared as the lowest (L1) bidder for the tender floated by the Rail Vikas Nigam (RVNL) for railway project on percentage rate (EPC project) in the state of Himachal Pradesh. 
 
The project is for construction of tunnels T14, T15 and T16, bridges and formation works from ch 40.430 to 44.925, including slope protection works and allied works in connection with Bhanupali-Bilaspur-Beri new railway line in the district Bilaspur of Himachal Pradesh (Package-5). 
 
The bid project cost is Rs 636.98 crore and completion period is 24 months.
← All latest storiesBack to top →