DFCCIL invites bids for construction of two-lane ROBIllustrative image – not actual.

The Dedicated Freight Corridor Corporation of India (DFCCIL) has floated tender for construction of two-lane rail over bridge (ROB).

 

The scope of work envisages construction of two-lane road over bridge (ROB) including approaches in lieu of existing level crossing (LC) nos 150 at railway 278 km/14-16 (DFCC ch 28967.59) between Gothangam-Sayan stations and 156 at railway 287 km/11-13 (DFCC Ch 37875.65) between Kudsad-Sayan stations of Western Railway in Gujarat.

The work will be executed in a period of 18 months at a cost of Rs 99.4 crore.

← All latest storiesBack to top →