DFCCIL floats tender for construction of ROBIllustrative image – not actual.

The Dedicated Freight Corridor Corporation of India (DFCCIL) has floated tender for construction of eight-lane road-over- bridge (ROB).

The scope of work encompasses construction of eight-lane (ROB), including approach portion over NH-2 and dismantling of the existing ROB at railway 407 km/29-408/1 (NH 41.089 km) as per the National Highways Authority of India (NHAI) standards between Sone Nagar-Baghabishunpur railway stations in Sonenagar-Garhwa section of East Central Railway in connection with construction of Eastern Dedicated Freight Corridor and six-laning of NH-2.

The work will entail an investment of Rs 108.17 crore to be executed in a period of 15 months.

← All latest storiesBack to top →