Illustrative image – not actual.
The Signature Bridge near Wazirabad in Delhi has a ‘final’ deadline of April 2017. The project, which was conceptualised in 2004, has seen its deadline extended numerous times.
The bridge will be an essential link between east and north Delhi. The delays have shot up its estimated cost from Rs 887 crore to Rs 1,594 crore.
